The project included using a helicopter to move
approximately 10 yards of gravel from the
Ira Spring Trailhead to a switchback area in talus at approximately
M.P 2.6. Three sets of rock steps were
constructed and approximately 436 feet of trail surfaced. The
work was done with a contractor to fly the gravel and the
district trail crew to build the rock
steps and complete spreading the surfacing material.
|