|

|
The trail was washed out at the 1.6 mile mark.
|
|

|
The new location of the trail is over 800 feet in
length and traverses the slope above the washout.
|
|

|
After
blasting away rocks and stumps, it's time for structures.
|
|

|
The
Backcountry Horsemen/Trail Duster Chapter constructed a section,
complete with log crib, rock crib and lots of digging.
|
|

|
The
trail is near completion.
|
|

|
With the re-route complete, the trail opened by June
2005. |
|
|